Independent reference site. Not a government website and not affiliated with any legislature or utility.Laws checked October 14, 2026

State law · New Hampshire

Is plug-in solar legal in New Hampshire?

Not yet in effect on October 14, 2026: New Hampshire’s SB 540 (Chapter 262) was signed on July 2, 2026, and most of it takes effect on January 1, 2027. It allows each metered customer one plug-in system with up to 1,200 W of AC inverter output and bars utility approval, interconnection review and related fees.

Where the bill stands
  1. Bill introducedSB 540
  2. Passed the legislaturedone
  3. SignedJul 2, 2026
  4. In effectJan 1, 2027
Signed, not yet in effect

New Hampshire

SB 540 was signed on July 2, 2026 and takes effect on January 1, 2027.

Bill
SB 540
Signed
July 2, 2026
Takes effect
January 1, 2027
Size limit
1,200 W (inverter output, AC)One system per metered customer.
Utility notice
The utility may set up a way for customers to report the system's wattage after installation; the information is for notification only.
Certification
certified by a nationally recognized testing laboratory to nationally recognized safety standards for distributed energy resources and plug-in solar generation systems (whole system)
Renters
The law does not say
HOA
The law does not say
Paid for exports
The law does not say
Utility fees
Banned by the law

Checked October 14, 2026

A typical year in New Hampshire800 W kit · railing, facing south · near the state's population center
Service ZIP033xxNew Hampshire
716 kWhproduced in a typical year
$112saved per year
9.8yearsPayback on a $1,099 kit

417 kWh used at home × 26.79¢ = $111.71; 299 kWh sent to the grid unpaid, 0 kWh lost to the inverter limit. At New Hampshire's average rate (EIA).

New Hampshire: SignedSB 540 was signed on July 2, 2026 and takes effect on January 1, 2027.
Bill
SB 540
Limit
1,200 W AC

Production by month, kWh

020406080kWhJanFebMarAprMayJunJulAugSepOctNovDec
  • Used at home
  • Sent to the grid

EcoFlow STREAM Microinverter + 2 × 400 W rigid panels, official store price checked Oct 14, 2026; sold out on that date.

Change it in the calculator

Kits that fit New Hampshire's 1,200 W limit

The same table as on the kits page, filtered by New Hampshire's size limit: 11 of 14 kits pass. The law also requires the whole system to be certified, so check the UL 3700 column and the product label before you buy. Prices from the official stores, with the date checked.

Plug-in solar kits with price, price per watt and certification
KitPanelsInverter limitBatteryUL 3700PricePer wattWhere to buy
EcoFlow STREAM Microinverter + 2 × 400 W rigid panels 800 W (2 × rigid) 1,200 W None UL 3700 status unknownchecked Oct 14, 2026 $1,099checked Oct 14, 2026sold out that day $1.37 Official site
Bright Saver Balcony Solar Kit 180 W (one panel) 180 W (1 × flexible) 360 W None Maker says it meets UL 3700; no UL listing foundchecked Oct 14, 2026 $285.30checked Oct 14, 2026member price; needs a paid membership $1.59 Official site
Craftstrom 1200 Watt Eco-Line Plug&Play Solar 1,200 W 1,200 W None Maker says it meets UL 3700; no UL listing foundchecked Oct 14, 2026 $2,250checked Oct 14, 2026 $1.88 Official site

All kits, with filters for every state

What the law says

SB 540 was signed by the Governor on July 2, 2026 as Chapter 262. Its final version says the act takes effect on January 1, 2027, except a building code section that waits until the Department of Energy certifies that a national standard for safe connection exists.

Each metered customer may have one plug-in solar generation system with a maximum inverter output of 1,200 W AC. The system must be certified by a nationally recognized testing laboratory to national safety standards for distributed energy resources and plug-in systems, and be installed and used under the state building code and the maker’s instructions.

A utility may not require its approval, an interconnection review or agreement, a fee related to the system other than charges for its use, or extra equipment. It may set up a way for customers to report the system’s wattage after installation, for notification only. The law does not address renters, HOAs or payment for exports; the Bright Saver tracker adds that qualifying systems need no permit.

  • Bill: SB 540, Chapter 262; signed July 2, 2026; takes effect January 1, 2027.
  • Size: one system per metered customer, up to 1,200 W AC of inverter output.
  • Utility: no approval, interconnection review or fees; an optional wattage report after installation.
  • Liability: the utility is not liable for damage or injury from a customer’s system.

Before you buy in New Hampshire

Check the utility, your landlord or your HOA before you install a plug-in kit. Bright Saver reports the law does not require a landlord's permission and says no permit or utility approval is needed for qualifying devices, but customers should confirm how their particular utility and building handle small photovoltaic equipment.

Check the product label and the seller's specifications for safety certifications. Some kits in the market list UL 1741 or similar interconnection standards; for example, EcoFlow kits name UL 1741 and Mango Power lists CA Rule 21 (UL 1741-SA) and IEEE 1547:2018 (UL 1741-SB). The EcoFlow listings show UL 3700 status as not published.

Use the calculator numbers for local production and the kit cards to compare models. The calculator gives production and savings for an 800 W kit at the state population center: mounted vertically, south-facing, it produces 716 kWh a year, with 417 kWh (58%) used at home and $112 a year saved at 26.79 cents per kWh (exports paid 0). Tilted 30° facing south the same 800 W kit produces 1,026 kWh and saves $134 a year.

  • Confirm whether the utility requires notification for your specific connection.
  • Ask your landlord or HOA about property rules even if the law reports no landlord permission required.
  • Check certification claims on the product page and label (UL 1741, UL 3700 status where published).
  • Kits that fit the 1,200 W cap include: EcoFlow 400 W and 800 W listings and the Mango Power 1,200 W kit (prices checked October 14, 2026).

Questions

When does SB 540 take effect?

On January 1, 2027. The final version of SB 540 (Chapter 262) says the act takes effect then, except a building code section that waits for a national standard. It was signed on July 2, 2026.

Is there a size limit for plug-in solar in New Hampshire?

Yes. Each metered customer may have one system with up to 1,200 W AC of inverter output.

Do I need a permit, inspection or utility approval?

The law bars utilities from requiring approval or an interconnection review. Bright Saver reports that qualifying plug-in systems "can be plugged into a standard outlet with no permit and no utility approval required." You should still confirm procedures with your local utility and building owner.

Will utilities charge fees for plug-in solar?

No. The law bars any fee related to the system, except charges the system incurs through its use.