Yes. New York’s S 8512A / A 9111C passed the legislature and, on October 14, 2026, awaits the governor’s signature. The bill defines portable plug-in solar, caps systems at 1,200 W of AC inverter output and sets certification and notification rules.
StatusAwaiting signature
BillS 8512A / A 9111C
Average rate, EIA29.38¢/kWh
CheckedOct 14, 2026
Where the bill stands
Bill introducedS 8512A / A 9111C
Passed the legislaturedone
Signedawaiting signature
In effectnot yet
Passed, awaiting signature
New York
S 8512A / A 9111C passed the legislature and is awaiting signature.
Effective dateDifferent bill versions in the sources set different effective dates (some drafts immediate, final version 90 days).
DetailAn earlier amendment set a 391 W threshold for requiring no wiring changes; the final version omits that threshold.
DetailThe bill text requires the owner to notify the utility within 30 days of installing; the Bright Saver tracker lists utility notification as not required.
Kits that fit New York's 1,200 W limit
The same table as on the kits page, filtered by New York's size limit: 11 of 14 kits pass. The law also requires the whole system to be certified, so check the UL 3700 column and the product label before you buy. Prices from the official stores, with the date checked.
Plug-in solar kits with price, price per watt and certification
Kit
Panels
Inverter limit
Battery
UL 3700
Price
Per watt
Where to buy
EcoFlowSTREAM Microinverter + 2 × 400 W rigid panels
The legislature’s bill S 8512A / A 9111C (passed and awaiting the governor’s signature) defines a “portable solar generation device” that is designed to connect through a standard outlet and exempts such devices from interconnection and net metering requirements. The bill explicitly says devices “is designed to be connected to a building's electrical system through a standard electrical outlet;” and “(a) A portable solar generation device shall not be subject to interconnection or net metering requirements.” (New York legislature.)
The bill sets a size cap based on inverter output: a maximum aggregate continuous AC inverter nameplate output of 1,200 W. It requires system-level safety certification — devices must be “listed or certified by an accredited nationally recognized testing laboratory as a complete plug-in photovoltaic system to a standard;” and it requires the owner to notify the serving electric corporation: “(d) Within thirty days of installing a portable solar generation device, the owner of such device shall notify the electric corporation serving the building in which such device will be installed.” (New York legislature.)
Size limit: 1,200 W of AC inverter output (the bill uses “maximum aggregate continuous AC inverter nameplate output”).
Connection: defined as through a standard electrical outlet.
Certification: must be listed/certified by an accredited nationally recognized testing laboratory as a complete plug-in PV system to a standard.
Notification: owner must notify the electric corporation within 30 days of installation.
Interconnection/net metering: devices are exempt; exported energy is uncompensated unless the customer enters a voluntary compensation agreement.
Utilities: the bill bars utility approval, fees or extra equipment requirements and limits utility liability for device-caused damage.
Before you buy in New York
Check three things first: the inverter nameplate (the law’s limit is 1,200 W AC), the product’s safety listing as a complete plug-in photovoltaic system by an accredited nationally recognized testing laboratory, and the notification process with your electric company. The bill requires owner notification to the electric corporation within thirty days of installation; it does not require prior utility approval or interconnection paperwork.
The law does not address renter permissions or HOA rules, so you should check your lease or HOA covenants before installing. Use the calculator for production estimates and the kit cards to compare inverter nameplate, certifications and current prices.
Notify your electric corporation within 30 days of installation (the bill’s text: “Within thirty days…”).
Confirm the product is listed/certified by an accredited NRTL as a complete plug-in PV system to a standard.
Make sure the inverter AC nameplate is ≤ 1,200 W (the cap is AC inverter output).
Know that exported energy is uncompensated unless you enter a voluntary compensation agreement.
The law does not change lease or HOA rules — check them before you install.
Questions
Do I need utility approval before I plug in a kit?
No. The bill exempts portable solar generation devices from interconnection and net metering requirements. However, the owner must notify the serving electric corporation within thirty days of installing the device.
Will I be paid for energy I send to the grid?
Not automatically. The law says any energy exported to the utility electric grid shall be uncompensated unless the customer voluntarily enters a net metering or other compensation agreement with the utility.
What certification does a kit need?
The bill requires that the device “is listed or certified by an accredited nationally recognized testing laboratory as a complete plug-in photovoltaic system to a standard.” Check the product label and seller documentation for an accredited NRTL listing for the complete system.
Can my landlord or HOA stop me from using a plug-in solar device?
The legislation text does not address renters or HOAs. The bill does require the state building code to allow outlet connection, but you should check your lease or HOA rules before installing.