Independent reference site. Not a government website and not affiliated with any legislature or utility.Laws checked October 14, 2026

State law · Vermont

Is plug-in solar legal in Vermont?

Yes. Vermont’s S 202 (Act 149) was signed on June 16, 2026 and has been in effect since July 1, 2026. Devices on one electric meter may total 1,200 W of inverter capacity, connect only where the home has a smart meter, and need UL 3700 or an equivalent certification.

Where the bill stands
  1. Bill introducedS 202
  2. Passed the legislaturedone
  3. SignedJun 16, 2026
  4. In effectJul 1, 2026
In effect

Vermont

S 202 was signed on June 16, 2026 and has been in effect since July 1, 2026.

Bill
S 202
Signed
June 16, 2026
In effect since
July 1, 2026
Size limit
1,200 W (inverter output, AC)Combined inverter capacity per electric meter; devices may only be connected where the home has a smart meter.
Utility notice
The law does not say
Certification
UL 3700 or an equivalent certification by an equivalent nationally recognized testing laboratory; IEEE 1547-2018 (whole system)
Renters
Landlord may set limitsThe tenant gives the landlord 10 days' notice; the landlord may answer with reasonable restrictions, and if it does not answer within 10 days the tenant may go ahead. Electrical work needs the landlord's permission.
HOA
Protected by the lawDeed restrictions and covenants may not prohibit a plug-in device; the exception for patio railings in condominiums, cooperatives and apartments does not apply to plug-in devices.
Paid for exports
Utility does not have to payExported power is not paid, and the device is not eligible for net metering.
Utility fees
Banned by the law

Checked October 14, 2026

A typical year in Vermont800 W kit · railing, facing south · near the state's population center
Service ZIP056xxVermont
657 kWhproduced in a typical year
$96saved per year
11.4yearsPayback on a $1,099 kit

401 kWh used at home × 23.95¢ = $96.11; 256 kWh sent to the grid unpaid, 0 kWh lost to the inverter limit. At Vermont's average rate (EIA).

Vermont: In effectS 202 was signed on June 16, 2026 and has been in effect since July 1, 2026.
Bill
S 202
Limit
1,200 W AC

Production by month, kWh

020406080kWhJanFebMarAprMayJunJulAugSepOctNovDec
  • Used at home
  • Sent to the grid

EcoFlow STREAM Microinverter + 2 × 400 W rigid panels, official store price checked Oct 14, 2026; sold out on that date.

Change it in the calculator

Kits that fit Vermont's 1,200 W limit

The same table as on the kits page, filtered by Vermont's size limit: 11 of 14 kits pass. The law also requires the whole system to be certified, so check the UL 3700 column and the product label before you buy. Prices from the official stores, with the date checked.

Plug-in solar kits with price, price per watt and certification
KitPanelsInverter limitBatteryUL 3700PricePer wattWhere to buy
EcoFlow STREAM Microinverter + 2 × 400 W rigid panels 800 W (2 × rigid) 1,200 W None UL 3700 status unknownchecked Oct 14, 2026 $1,099checked Oct 14, 2026sold out that day $1.37 Official site
Bright Saver Balcony Solar Kit 180 W (one panel) 180 W (1 × flexible) 360 W None Maker says it meets UL 3700; no UL listing foundchecked Oct 14, 2026 $285.30checked Oct 14, 2026member price; needs a paid membership $1.59 Official site
Craftstrom 1200 Watt Eco-Line Plug&Play Solar 1,200 W 1,200 W None Maker says it meets UL 3700; no UL listing foundchecked Oct 14, 2026 $2,250checked Oct 14, 2026 $1.88 Official site

All kits, with filters for every state

What the law says

Act 149 (S 202) was signed on June 16, 2026 and took effect on July 1, 2026. A customer may install one or more plug-in devices per electric meter if their combined inverter capacity is not more than 1,200 W. Devices may only be connected where the home has a smart meter, and each must be securely attached to the ground or a structure.

A device must comply with UL 3700 or an equivalent certification by an equivalent nationally recognized testing laboratory, be installed and operated under IEEE 1547-2018, and must not energize the building during an outage. A utility may not require its approval, a fee related to the installation or extra equipment, and no interconnection agreement is needed. The utility may still recover costs if a device overloads the service.

Exported power is not paid, and a customer with net metering may not also install a plug-in device. A tenant gives the landlord at least 10 days’ notice; the landlord may answer within 10 days with reasonable restrictions, such as requiring a licensed electrician for any electrical work, and if it does not answer the tenant may go ahead. Deed restrictions and covenants may not prohibit a plug-in device.

  • Size: 1,200 W of combined inverter capacity per electric meter.
  • Certification: UL 3700 or an equivalent certification; IEEE 1547-2018.
  • Exports: not paid; not combined with net metering.

Before you buy in Vermont

Check three things before you buy: the product’s certification, your landlord’s or association’s rules, and your meter. The law asks for UL 3700 or an equivalent certification, so check the product listing or the certifier’s database; a seller’s own claim is not a listing. Ask your utility whether your home has a smart meter, since devices may only be connected to systems with one.

If you rent, give your landlord at least 10 days’ notice before you install. The landlord may answer with reasonable restrictions, and any electrical work needs the landlord’s permission. Covenants may not prohibit a plug-in device, but placement rules may still apply.

The calculator gives real production and savings numbers for Vermont. An 800 W kit, vertical and facing south, produces 657 kWh in a typical year; 401 kWh (61%) is used at home and 256 kWh goes to the grid, and the home-used power is worth $96 a year at Vermont’s 23.95 cents/kWh. Tilted at 30° the same 800 W kit produces 948 kWh a year and saves $116. A 1,200 W kit, vertical and south, produces 985 kWh a year and saves $107 (the calculator results are site-computed).

  • Confirm a UL 3700 listing or an equivalent certification on the certifier database
  • Give your landlord 10 days’ notice and check any restrictions it sets
  • Confirm price and stock: EcoFlow 800 W kit $1,099 (sold out Oct 14, 2026); EcoFlow 400 W kit $799 (Oct 14, 2026); Mango Power 1,200 W kit $2,698 (Oct 14, 2026)
  • Use the calculator for address-specific production and the kits list to compare models

Questions

Do I need my landlord’s permission to plug in a kit?

You give the landlord at least 10 days’ notice before installing. The landlord may answer within 10 days with reasonable restrictions; if it does not answer, you may go ahead. Electrical work for the installation needs the landlord’s permission.

Do I need utility approval or a permit?

No. A utility may not require its approval, a fee related to the installation or extra equipment, and no interconnection agreement is needed. Devices may only be connected where the home has a smart meter.

How big can my plug-in system be in Vermont?

Devices on one electric meter may total 1,200 W of inverter capacity. The limit is on the inverter, so check the inverter rating, not only the panel wattage.

Does Vermont require a specific safety listing?

Yes: UL 3700 or an equivalent certification by a nationally recognized testing laboratory, plus installation and operation under IEEE 1547-2018. Some sellers list only UL 1741, so check for a UL 3700 listing.